For Sale: 2002 Bombardier Challenger 604
Jet Aircraft

Lowest total time Challenger 604 on the market
One owner since new
Hangared in a climate-controlled facility
Highly desired 12 passenger interior
-150 APU Upgrade and on MSP
Engines on GE On-Point
On SmartParts
New Paint in 2018 at Bombardier
CAMP Maintenance Tracking
Autothrottles: Safe Flight Enhanced Auto Power System
Detailed Information
Airframe
Total Time Since New: 3,877 hours
Total Landings Since New: 2,171 landings
Maintenance Tracking: CAMP
Program Coverage: SmartParts
Engines
Left/ Right: General Electric CF34-3B
Serial Number: Left: 873221/ Right: 873214
Total Time Since New: Left/ Right: 3,877 Hours
Time Before Overhaul: Left/ Right: On Condition
Total Cycles Since New: Left/ Right: 2,171 Cycles
Program Coverage: Left/ Right: GE On-Point
APU Details:
Honeywell Gtcp-150 (CL)
Total Time Since New: 4,090 Hours
Serial Number: P-540C
Program Coverage: MSP
Interior Details
FWD 4-Place Club with AFT 4-Place conference Group opposite a 4-Place Divan
Jumpseat
High-Temp Oven
Coffeemaker
Airshow 400
FWD & AFT 18” Monitors
DVD Player
Exterior Details
Base Color: White
Stripe Colors: Navy Blue and Silver Accents
Last Painted Date: 2018 at Bombardier
Avionics
Collins Pro Line 4
ADF: Dual Collins ADF-462
Air Data Computer: Dual Collins ADC-850E
CVR: L3Harris A200S
DME: Dual Collins DME-442
EGPWS: Honeywell MK V
EFIS: 6-Tube Collins EFD-4077
FDR: L3Harris F800
FMC Dual Collins FMC-6000
GPS: Dual Collins GPS-4000S (WAAS Capable)
HF Comms: Dual Collins HF-9031A
IRU: Collins LTN-101
Lightning Detection System
Radio Altimeter: Dual Collins ALT-55B
Radio Tuning Unit: Dual Collins RTU-4000
TCAS: Collins TTR-921 TCAS II w/Change 7.1
Transponder: Dual Collins TDR-94D (v.1/DO-260A Compliant)
VHF Comms: Dual Collins VHF-422C (8.33 Spacing)
VHF Navigation: Dual Collins VIR-432
Weather Radar: Collins RTA-854
Condition
12 Month: Last Completed September 2022; Next Due July 2023
24 Month: Last Completed September 2022; Next Due July 2024
36 Month: Last Completed September 2022; Next Due July 2025
48 Month: Last Completed September 2022; Next Due September 2026
96 Month: Last Completed October 2018; Next Due October 2026
Landing Gear Overhaul: Last Completed October 2018; Next Due October 2026
Engine TBO - On Condition